💙 Everything here is free —  here are the ways you can help keep it that way, and most of them cost nothing    See how →
Risk Register, Issue Log, Assumptions and Constraints Example — Quality of Life Project
Version
Download 1
File Size 23.70 KB
File Count 1
Create Date October 15, 2026
Last Updated November 5, 2026
Login is required to access this page
or download free
[free_download_btn]

Description

Download Risk Register, Issue Log, Assumptions and Constraints Example — Quality of Life Project — free

It costs nothing. It needs a free Project Together account, and that same account opens every template, example and guide published here — not just this one.

Create your free account & download

Already a member? Sign in here and you come straight back, with the download open.

This is the Risk Register, Issue Log, Assumptions and Constraints of the Quality of Life project — the example I follow in my book Project Management in 10 Steps, from the first page to the last. It is the document of Step 3 of the book. Open it to see the finished document on a real project, then write your own.

About the Quality of Life project

A personal project, run alongside a full-time job: you are the project manager and the customer. One objective — “improve my quality of life, sustainably” — with four key results (annual income, monthly balance, productivity at work, BMI), served by five deliverables: a promotion at your company, lower monthly spending, fewer unproductive hours, fewer incidents and a healthy life. The scope is known and stable, so the approach is predictive. The project runs from October 2017 to December 2018, and the documents show it as it stood on 15 December 2017.

What is in this example?

Tabs:

  • Risks & Issues
  • Actions
  • Graph

How to use it

  1. Read it beside Step 3 of the book: it shows what "done" looks like.
  2. Open the blank template and write your own project into it.
  3. Or let the free Project Together course do the typing: it reads your project board and writes this same document, with your numbers in it.

The blank template

Prefer to start from a blank page? Download the Risk Register Template.

The whole example, in one download

Every document of the Quality of Life example, the templates of the ten steps and the Horizon Transport corporate example are in the Together Kit of Project Management in 10 Steps, free for readers of the book. See the book.

Project Management in 10 Steps, by Eduardo Montes

Source: PMBOK Guide, Eighth Edition (Project Management Institute).

Blank template: Risk Register Template

Categories & Tags

Similar Downloads

Eduardo Montes

Leave a Reply